Showing posts with label Remodel. Show all posts
Showing posts with label Remodel. Show all posts

Monday, May 19, 2008

Busy

I see it's been nearly a month since I last posted anything. I guess that means I've been pretty busy.

A synopsis (of what I can remember):
The main floor bathroom is nearly finished! I scrambled with getting the painting done and flooring layed down in order to get it done before Plumber Dennis B. had to get into the field. Had it been a normal year, he would have been done with corn planting before finishing his part of our bathroom. But, rain delayed that and gave him ample time to finish. The painting and laying of the floor took nearly a week. I finished that and then Dennis finished right after Mother's day, installing one last shelf for me (with all other stuff done Friday before Mother's day). We can use it now. But I've got the little things left to do. I need to hang various items like the toilet tissue holder, a couple shelves and the towel rods. I am also trying to make the medicine cabinet mirror frame and the light bar wood piece match the vanity. That has been a challenge! I may just have to decide on something and live with it.
The attic windows were in serious disrepair, with the cute little window panes falling out of the frames and landing to the ground, breaking. With some further investigation, much of the wood that held those little panes in were rotten. Also, the wood on some of the other attic windows was rotten. Thus, all attic windows but one (the one repaired last year) were taken to a repair shop. At this point, only the window repaired last year hangs in its proper local. All others have been repaired and are in the midst of being painted - with the primer job done last night. I also painted the sills and casing in the attic. Unfortunately I'm not a monkey and can't hang out the window openings and paint the entire doghouse part of the attics. I will just have to be "happy" with the casing and sills being painted. So, at this point, nothing keeps out the birds, bees and worse yet wasps! Oh, maybe that's not the worse. Maybe the weather is. I hope any serious storming holds off till after I'm done. Otherwise I'm going to have to scramble to put some plastic over the openings!
While all this is going on, the grass and weeds are growing, growing, growing! While most people had mowed their lawns once, possible twice before Mother's day, I had been so busy with the bathroom project and attic windows that I hadn't gotten to that until the end of this last week. The weather had also improved long enough for me to get that accomplished too. So, I got the lawn mowed and weeds sprayed over the weekend. A "nice" groomed lawn always makes me feel better. Glad to have it done.
Also, I had been babysitting little Mitchell for 2 mornings a week up until Tuesday, May 13th, with the exception of the week of April 28th thru May 2nd. That week I was hard at painting. Plus Russ came home Friday, May 2nd. Spring semester is done now, so Anna won't need my help now for awhile. The only reason I watched Mitchell was cuz her regular daycare had a minimum charge per week that amounted to a rediculous amount per hour for her needs at the time. Anna was going to school 2 mornings a week and the $'s just weren't reasonable. So, I filled in for a short time, helping her to save some of those bucks.
And then there is our farming. I've made myself as available as I could. I helped with some working up. Ronny finished corn planting last night while I was painting the attic casings. He had asked that I be available for working up the bean ground this morning while he went to town to pick up bean seed. But, it rained some last night. Thus, I haven't seen hide nor hair of him this morning. I didn't think it rained that much. But, I haven't worked in that field. So, it's possible that any amount of rain would be too much. Although I'm antsy to get the field work done - since this planting season has drug on so long - I have to trust Ronny's judgement that it's apparently not fit to work. I'll give him a call pretty soon to find out what he's thinking here shortly.

Some synopsis! And I didn't even include things like Mother's day and partying and Mother's for Dad's birthday and Mother's day. I'm sure I forgot other things too!

Thinking forward: This next weekend is Memeorial Day weekend. Russ is coming home. I'm looking forward to that! David and Adrienne move out of their Duluth home on May 31st. That is a particularly busy day. Matthew is having his graduation party that evening. I hope David, Adrienne and I have the moving done so we can attend his party! They are moving in with me until after the wedding. They will be moving to St. Paul in July for when David continues his Doctor training. So, moving home seemed the most reasonabl thing to do - sticking their wedding plans in there too! Their wedding is continually a part of my thoughts these days and I'm not even the guest of honor. Just imagine how they feel!

Well, enough rambling for now! Hopefully I'll get back to this a little sooner next time. But, it is Spring and so much to do. -- Nicholas, thanks for helping me plant my Easter gift. The plants have sprouted and so far still green and will continue to be if I don't forget to water them!

Saturday, April 26, 2008

Snow

Who said it could! It's been snowing for most of the evening. And now (midnight) the ground is white! I guess that it's a good thing I have this painting to do. I decided to paint both bathrooms. Today (or yesterday by time of day sake) I taped and prepped both bathrooms for painting. That took me much of the day. I started priming the upstairs bathroom around 6 p.m. And now, after midnight, I've finished and cleaned up. Since I took the lights out of the main floor bathroom, work on that one will have to wait till daylight. So, on to bed and try to get some rest. I need to get after the priming of that bathroom as soon as I can get up and motivated in the morning. I hope to be done painting by Tuesday night. But am not sure that will happen since I have a couple things to take me away from it on Monday & Tuesday. We'll see.

Thursday, April 10, 2008

Construction

Denny came by on Monday and installed the East Storm door. Looks good!

Other than that, the construction has been on hold. Denny (D.B.) told me that he wasn't able to reach Dennis Domeier over the weekend. Thus, he didn't know when D.D. would be coming.

I've been thinking about my paint job, mulling through ideas of techniques and colors. I think I've settled on both. I have to paint and install the floor before D.B. can come back and finish. But, I can't do that stuff until D.D. finishes his job. Hope the job starts progressing soon.

Thursday, April 3, 2008

Construction continues

Denny arrived around 10 a.m. today. He needed to conduct personal business this morning. Thus, arrived a little later than normal.

He got the wall studded up behind the shower stall and all the plumbing done for it too.
We also discussed how I wanted to handle the linen closet. The old one won't fit back into the space. So we decided that the wall behind the shower stall will be sheetrocked out and Jandel will make a cabinet face to finish it out. He also gave me some some thoughts to ponder. I have to decisions to make about door size for the linen closet. Also, I need to look for a vanity. Things to do.



Pictures from Bathroom Remodel

This is the debris from 2 walls, a shower stall and an old vent fan. Didn't know so little could make such a big mess!


Looking up. I replaced the ceiling vent fan. Because the previous wires were too short to meet the new vent fan, I had to put in a juntion box too. Not the prettiest, but it meets code and works! Denny also sheetrocked the ceiling. I helped hold up the sheetrock while he screwed it in place.

A view of some of the new insulation and new studs Denny put in to make the shower install possible.

Another view of studs & insulation - and of course the shower stall.

Another view. By the way, notice, no shower head. There's absolutely no way to take a shower in this shower stall yet.

A view of where the new wall, with new studs and insulation meet the old next to the window. I'll have to remove the brown rectangles below the window. They were part of the toilet paper roll holder. They are destroyed, so of no good use now.

Another view of the shower stall, showing how there is no hole placement for any plumbing, other than the drain. I guess that makes sense. When they build it, they don't know where the consumer wants them.

A view of the cement mud at the underside of the shower stall. We placed the shower stall in first, then Denny mixed the cement and used a long stick to shove the cement under and in place. I had always wondered how it was done.

Wednesday, April 2, 2008

Construction

(This is not a photo from our bathroom. But it shows some of the insulation mess and bare studs. I'll get some pics when my camera batteries are recharged.)


Denny finished placing the shower stall today. He put cement under the stall to ensure that the floor doesn't have any give. Therefore this shower stall should never crack. Tonight I will slowly clean up the dust - and maybe get a load of clothes washed. Everything one takes for granted, from throwing a load of clothes in the washer to making a meal has now become much more of a chore. The dust is coating everything. Thus, before getting the laundry started, I must clean.

Note to all that may consider remodeling in the future: Put EVERYTHING away that can be put away.


I have to clean the toaster, the coffee pot, pretty much everything. I didn't even give it a thought to put those things away before we started because these things were not in the bathroom. The dust is coating everything. I'm going to have clean a layer of dust off in the dining room and the living room too. Those rooms aren't as bad as the kitchen, but they still need it! Hopefully the furnace doesn't kick too much dust up into the upstairs! If that is the case, the worst part of the upstairs cleanup will be what I drag up with my shoes and dirty clothes.

Construction

What a mess! Dust all over. On Monday Dennis Blumhoeffer came by and started in on remodeling the main floor bathroom. The shower floor was shot, as most of you know. So, we wanted a new shower to replace the old. For a project that didn't seem like a very big one, since the room is so tiny, it sure doesn't seem so little any more.

After removing the shower, we decided to remove the walls - lathe and plaster - behind the shower so we could insulate it properly. So, here comes the messy part. Dust, dust and more dust. And sore muscles. Denny started ripping down the walls. But, I had the honor of beating most of the plaster off. I probably would have been done before he came back on Tuesday. But, I decided that I should replace the bath fan (combo heater, fan and light) in the ceiling. So, I took a trip to Mankato and back for that mission. Then, upon returning, I worked on replacing it. In addition to that, I removed the toilet from the room and an electrical outlet box that was no longer used, but still had a hot wire in it. (I took the wire into the basement and wire nutted and taped off the ends so I can use it again, placing a gfi receptacle into the Northwest room in the basement - a job for another day.) By the time I got done replacing the bath fan and the other fore mentioned things, it was after 1 a.m. I chose to go to bed, rather than tear down the walls.

I got up at 6 a.m. and started working on removing the plaster. I was almost finished when he arrived at around 8:30. He worked on removing the lathe and the insulation, dumping the stuff on the bathroom floor. I tried to pick up while he was doing it, but two people in that little bathroom didn't work very well. So, I backed off until he went for lunch.

While he was gone for lunch and also getting supplies, I finished cleaning up the mess and removing the remaining lathe and insulation. Now we have a "healthy" pile of debris west of the house - another project for a warmer day, and when I have the Bobcat back.

After cleaning up that debris and pulling away the old linoleum, we found that the floor was in very poor shape due to the tremendous water leak from the shower. So, the executive decision of replacing the whole bathroom floor was made. Thus, we removed the vanity which caused another executive decision. I will now be purchasing a new vanity to replace that one. So, after removing the vanity, Denny Sawzall-ed the floor next to the south wall and started removing the floor boards. By that time, it was late enough for Denny to quit for the day. The rest of the floor removal was left to me (if I wanted, and I did). I removed the remaining floor boards and vacuumed up the remaining mess.

By the time I was done with Monday's and Tuesday's activities I felt like I could hardly move. Fortunately, today Denny hasn't needed my help much. So, I took some much needed time away from the project to tend to other things - and maybe heal up a bit. Denny will need my help some time this afternoon to place the shower in the bathroom. Until then, he is working on insulating the walls and getting the room ready for the shower placement. At the time of this writing (a little after 3 p.m.), he has most, if not all of the insulation in the walls and the floor laid. I think he's putting up the plastic sheathing for vapor barrior right now. It should be pretty quick that he'll need my help. I'm not sure what other things he'll need to do to prepare. But, he's getting pretty close.